Must a Thousand Oaks HOA put its new roof decision in writing?

Yes. When the governing documents require approval for exterior changes, Civil Code section 4765 says your homeowners association (HOA) must decide on a new roof in writing, and any refusal has to give its reasons and lay out the route to a board rehearing.

That rule shapes how a re-roof gets scheduled in a planned community. Before you sign with a Thousand Oaks roof replacement company, find out whether a new material, color or profile needs approval, and file the request early enough that the written decision is in hand before tear-off.

When does section 4765 apply?

Civil Code section 4765 comes into play if your community’s rules say an owner needs the association’s sign-off before altering their own property or the shared areas. Ask whether a like-for-like re-roof needs approval, and treat a switch from shakes to tile, or from gray to terracotta, as a change to clear in advance.

The association also has to tell members which kinds of changes need approval, along with a copy of the procedure it uses. If you cannot find that notice, ask the manager for the current one before you collect bids.

What must the approval procedure look like?

Under the statute, the procedure belongs in the governing documents and must be fair, reasonable and expeditious. It needs firm deadlines, including a stated limit on the response period for an application or a request for reconsideration. The board must act in good faith; a ruling that is arbitrary, capricious or unreasonable falls short of the statute.

For a re-roof, the stated response time is the figure to ask for first. It tells you how far ahead of the roofer’s start date the request has to go in, and it gives you a firm point to follow up on if nothing arrives.

Send the request the way the documents ask, keep a copy and note the date it went in. A clean paper trail makes the response deadline easy to track and leaves no doubt about what the association was asked to approve.

Can an association approve something the code forbids?

No. Whatever the governing documents say, section 4765 bars a ruling that would break a building code or another public safety or land use law. Inside Thousand Oaks, the Municipal Code calls for Class A fire-rated roofs, so any material the association approves still has to carry that rating.

The statute also runs the other way. It does not authorize a change to the common area that conflicts with the governing documents unless the law requires the change. If your roof is common area, any change to it has to fit those documents.

What if the answer is no?

A denial arrives in writing with the reasons and the steps for reconsideration. You are then entitled to reconsideration by the board at an open meeting, unless the first ruling came from the board itself, or a body with the same members, at a properly held board meeting.

Work from the stated reasons. A denial over color may be met with another shade from the same product line, while a denial over material may call for a new bid. Keep every letter, since the written record is what the statute is built around.

The statute also notes that this board reconsideration is not the formal dispute resolution process the law sets up elsewhere, so asking for a rehearing is a separate step from that process.

  • The product name, profile and color, with a manufacturer sheet or sample.
  • The fire class of the covering and the assembly it is tested in.
  • Any change to vents, skylights, gutters or edge metal seen from the street.
  • Photos of the roof as it stands now.
  • The roofer’s planned start date and a contact for questions.

Short answers

Does the association have to answer within a set period?

Its procedure must state a maximum response time for applications and for reconsideration requests. Ask for that figure in writing.

Do I get a rehearing if the roof is denied?

Yes, reconsideration by the board at an open meeting, unless the board itself made the first ruling at a proper meeting.

Can the association require a roof without a fire rating?

No. Section 4765 bars decisions that break a building code, and inside city limits the City requires Class A on all roofs.

Roofing H Thousand Oaks works on residential and commercial roofs in Westlake Village, Thousand Oaks, Newbury Park, Lynn Ranch and Casa Conejo, covering replacement, repair, installation and maintenance. Planning an association request for a new roof? Call 805-227-8617 and tell us the product and color under consideration.

Next in this series: How should payments be scheduled on a Thousand Oaks new roof?.

Leave a Comment

Your email address will not be published. Required fields are marked *